Parking and Transportation Advisory Board Notes
 

January 30, 2007

  Introductions of Committee and PTS Staff

 Update on Current Parking Programs         

Ø     Permit Availability

We have most permits available except Zone 1, Park Ave. and Second Street Garages.  We are 90% capacity

Zone 1 - 1,100 on the wait list

New student can pre-reg after April 15

We have the ability to put holds for new employees that are    replacing someone with a permit

This year we have had more permit spaces than we ever had

We will be losing 600-700 spaces to construction in 2008.     

Ø     Shuttle Ridership

Cat Tran 14.4% increase of riders

We have 16 buses - 13 to 14 buses always on route

Mauve Route ridership increased from 34,000 to 47,817 from last year

Teal Route ridership increased from 71,530 to 95,702

Ø      College of Medicine – Phoenix

We will be managing parking at COM - Phoenix

Permit prices will be $450 which is a break even point

New parking lot will have 350 spaces – long term will require a parking structure

We will outsource the lot management.  If we build a parking structure we may open a statelite office to manage the structure. 

Information Updates

Ø      I-10 Widening Project

Most everyone will be affected by this project.  Traffic signals lights timing will be changed

We are trying to promote Alternative Transportation

Employees may want to shift time schedules

Construction of the project will begin in May or June

During the summer people will get acclimated and find alternate routes to their destination

PTS will have weekly updates on our web page

Other Alternative Transportation means are Vanpool or Carpools

Ø     Transportation Needs Assessment Grant

We are in the process to obtain a grant to help with bike pedestrian paths

Received grant to do a 9 month study which will consist of surveys on how to make transit improvements for campus

In the last 2 1/2 yrs we have obtained about a quarter of a million dollars in grants

Ø      Bicycle Lockers

We have added bike lockers at the turn around near AHSC and the west side of the 6th Street garage

Budgeted for next year to double the capacity of bike lockers (Vendor Cycle Safe)

The wait list for bicycle lockers is very small

Cost is $30 a semester and $60 for the year

Bicycle lockers are very expensive $2,500 per locker which holds 2 bikes each

Ø      Cherry Garage Expansion

We will start construction on March 1, 2007

Adding 250 spaces on the south side of the garage

Expansion will include an elevator on the west side

Expansion will make us ADA compliant

Project to be completed by August 1, 2007

The garage will be controlled until midnight

The cost per space for this expansion is $26,000 per space compared to the Highland garage which was $11,000 a space

Cherry Entrance will be closed April 2nd  will reopen the day commencement.

The National Championship entrance will close on May 14, 2007 for the duration of the project

We have not released any additional permits because of the construction

6093 lot meters will be taken out and converted to lot specific

Question:  Why do the garages do not have restrooms?

Patrick said rest rooms are not part of the infrastructure.  Most garages do not have rest rooms.

Mike to ask Dick to get with the commencement group to see if they can provide port potties  

Future Program Discussions

Ø     With the Rec. Center expansion it will eliminate the remaining flex lot we have

We may get 200 spaces back after the construction 

Ø     Addition of the Corleone Parking Lot Specific

 The Law School is being renovated; they will relocate to the Corleone Restaurant during renovations

In May we will loose the 1016 lot

In August we will get spaces from the apartments when the leases expires 81 spaces will be lot specific (install meters and disabled spaces)

Revenue from the lot will need to be shared with Administration

Ø     Changes to Shuttle Routes

Ridership for the Night Cat Tran is 2,500 for the last 6 months

We will have the Marketing person work on marketing this route

We will keep the route for another year

Neighborhood Association approved the route going through 7th Street

Teal Route – Take off the stop at the circle behind the Student Union and put a stop on 2nd Street

Moving USA Route up to Drachman and have a stop at McClelland

In 2008, we will be losing the 5070 lot to a new dorm, half of 5072 lot to a dorm, 6091 to a dorm (600 spaces)

Dorm construction will be adding 800 new beds 

Ø     Fee Increases

May need to raise the rates because of the following:

  •       Increase Admin Service fee 7% maybe 8 or 9%

  •       ERE    3%

  •       Raises  3.5%

We get no state funding, we are an Auxiliary Department

Football season was the best revenue we have had to date

If we had a fee increase the suggestion was to increase $.50 to $1.00 per pay period

Students would like no increase

Question - Metered parking?  Not as effective as garage visitor parking you pay for the usage in garages.  Meters run out of money and you get cited.

 Question - Underground parking – 2.5  times the cost of construction verses an above ground structure

 Question - Service vehicle parking – We do not get revenue for service vehicle spaces

 

September 27, 2006

1. Introductions of Committee and PTS Staff

2. Overview of PTS

Ø     Citations revenues are less than 10% of the Budget

Ø     Garage construction costs are increasing. Budgeting $16,000 a space for the Cherry Ave. Garage Expansion

Ø     We oversell spaces because of the variance in schedules of employees and students

Ø     Currently we have 10,000 bikes on campus daily

Ø     We are taking on more responsibilities such as enforcement of traffic movements in the garages and design of street layouts  

3. Update on FY 2006-2007 Parking Programs    

a.     Permit Sales and Availability

Ø     Rate Increase: Did not hear very many complaints about the increase

Ø     Visitor parking rate increase for departments there were no complaints

Ø     This year we were 50 permits from being sold out

Ø     Zone 1 wait list went up to 2,300, but now down to 1,200

Ø     2nd Street and Park Avenue Garages have no permits available

Ø     8,900 permits were purchased on the web page

Ø     All communication with customers was done through e-mail. Permits purchased on line increased 28%

          b. Shuttle Ridership

  Increase in ridership

Ø     July was 16% increase over last year

Ø     August was 40.6% increase over last year

Ø     September – Month is not over but we have already surpassed last years total

Ø     Overall we have had a 22% increase (23,300 passengers) over the same period last year                       

Ø     Implemented the Nite Cat Tran. Operational hours from 6:30pm-12:30pm

Ø     Purchased 4 new shuttles and changed the logos

Ø     2 bus shelters with solar lighting will be added through monies from a grant

Ø     COT Ticket bus will come up to Main Gate for drop off

Ø     Added a stop at USA to interline with Ticket bus

Ø     We will be getting 3 golf carts next month for Cart Service through grant money

Ø     Cat service is stable compared to last year

Ø     Bicycle Program – Getting grant to help with planning of bike routes

Ø     Working with Facilities to remove obstruction to several campus bike paths

Ø     Converting 2 rooms in 2nd Street and Cherry Avenue garages to provide secured bicycle parking areas

Ø     UAPD received a grant to sell bike locks & U-Locks at cost. We partnered with them to sell at our office.

Ø     Added stencils to define bike paths

         c. Traffic Enforcement in Parking Garages

Ø     Modified speed limit in garages to 15 miles per hour

Ø     Updated signage in all garages to new limit and installed additional traffic signs

Ø     Purchased a radar that will take pictures of violators. Will begin citing on Monday, October 2

Ø     Citations will be a $50 fine. Citations will be for failing to stop, driving the wrong way and speeding

Ø     Citations will be attached to the registered owner of the vehicle

Ø     There is an appeal process in place for those wanting to appeal the citation

Ø     We will conduct an additional traffic study in the spring to see if traffic is slowing due to enforcement

        d. Marketing Associate Specialist

Ø     New Marketing Specialist down to finalist. We are completing reference checks and plan to make an offer next week and have individual on board by the middle  of the month

4. Current and Future Operational Issues

        a. Bicycle Parking Near the Student Union

Ø     Bicycle parking on east and south sides of the building

Ø     Open bike enclosures in 2nd Street Garage

Ø     Look at west side to add more racks

Ø     Will look at north and west sides for additional bicycle racks 

        b. Usage and Parking of Golf Carts on Campus

Ø     Send out 3D memo –Regulations on Golf Carts

Ø     Equipment is recommended by Risk Management

Ø     Define where golf carts can park. We will send individuals letters out to whoever owns a golf cart explaining where to park. 

        c. I-10 Widening Project

Ø     40% of campus will be impacted

Ø     We will have a construction schedule from ADOT next week

Ø     Prince through 22nd Street off/on ramps will be closed in March 2007

Ø     Frontage road traffic lights will be retimed to accommodate traffic

Ø     Project will be completed in 3 1/2 years

Ø     Having discussions with departments to look at alternative work schedules for employees to help reduce traffic congestion. 

        d. College of Medicine- Phoenix Campus

Ø     PTS was asked to manage the parking for the campus

Ø     70 parking spaces in 2 lots

Ø     Must provide alternative transportation/may need bus passes

Ø     Many issues still need to be worked out

Ø     Hope to have the program in place by the middle of October 

5. Other Questions or Concerns 

CAG EXPANSION

Ø     Adding 250 spaces

Ø     1 bay of parking to the south

Ø     Adding 1 elevator west side

Ø     Creating van accessible disabled spaces

Ø     Adding cashier for visitor parking

Ø     Start project after basketball season

Ø     Project to be completed beginning of school in the fall (2007) 

PARKING NEAR HELEN

Ø     2029 lot will have 110 parking spaces when fully developed in December 

STRIPPING OF CHERRY CROSSWALK

Ø     Street belongs to the City of Tucson working with COT engineers to develop the area 

RING ROAD PARKING

Ø     After detailed measurements we were able to keep the parking while reinstalling the bike lane  

TRACKING SYSTEM

Ø     A tracking system using WI-FI has been implemented for buses to determine exact times when the shuttle will get from point A to point B.  Will be completed in the fall (2006).

Ø     Program will allow customers to access bus information via the web and through text messages. 

 

April 19, 2006

  • Cat Tran will be offering evening service beginning Fall 06

  • Plans for an extension on Cherry Garage (200-300 spaces) – Aug. 07. Add cashier, elevator and area for high-profile vans for disabled.

  • Permits are issued to students (75%) and staff (25%).

  • ASU is raising their parking rates to equal UA with plans to increase again in 08-09.

  • Discussion on garage advertising revenue – remains in consideration.

  • Discussion on warnings and tickets given for speeding/driving/parking violations in garages. Speed limit will be increased as 5 mph is not possible and encourages people to speed.  Wrong-way driving and illegal turns are being monitored.

  • This was last meeting of the year – typically held every 1-1/2 months during school year.

 